The Trucking Job completed with total 7 unit Bonded Truck with one set Custom Clearance within
One Day (24 hrs)completed from Singapore to Portklang North Port for connecting BB Vessel to Maldive.
The Cargoes detail :
Main Body of the Use Kobelco Crawer Crane with Base of 7.5 M ( LOADED 50FT LL OOG @40MT)
Top Boom 7.5M (LOADED LL OOG BONDED TRUCK @32MT)
TOTAL of 21 Packages 141780kg.